Klemtu II Hydro
British Columbia, Canada
Statistics:
 |
Turbine: One 820mm double nozzle Pelton |
 |
Generator: One 1800kW WEG @ 900 RPM |
 |
Rated head: 310m |
 |
Rated flow: 0.66m3/sec |
 |
Commissioned: November 2009 |
This new facility replaces the existing 600kW power plant of
which the generation equipment was also supplied by DTL (see Klemtu
Village project in 1984). It provides increasingly demanded power
to this growing village. A new penstock approximately 1000m long
was installed and connected to the penstock of the 600kW plant, which
draws water from Baron Lake. Via Internet connection, the status
of this plant can be viewed using any Internet browsers.
|