Castle Creek Hydroelectric Project

McBride, British Columbia, Canada

Statistics:

bullet

Turbine: Two (2) double nozzle Pelton

bullet

Generator: Two 4000kW Hyundai Ideal @ 600 RPM

bullet

Rated head: 266m

bullet

Rated flow: 1.75m3/sec each turbine

bullet

Commissioned: April 2015

This 8MW run-of-river project is owned and constructed by Castle Mountain Hydro Ltd., a Canadian owned company with extensive experience in hydroelectric projects.  The project is expected to be able to provide sufficient energy to power the community of McBride in the event of a power outage.

   

Intake

Powerhouse

   

One of two turbine-generator units

Switchyard

   

Turbine Inlet

Pelton runner